Concession control for deviations from an organization's procedures
Concession control for deviations from an organization's procedures in an Approved Maintenance Organization (AMO) is a critical aspect of maintaining safety, compliance, and quality standards. Concession control involves the management of non-conformances and the authorization of deviations from established procedures under specific conditions. Here’s a detailed guide on how to establish and manage concession control in an AMO:
Key Elements of Concession Control
Definition and Scope:
- Clearly define what constitutes a concession or deviation from standard procedures.
- Establish the scope of concession control, including the types of deviations that can be considered and the limitations.
Authority and Responsibility:
- Designate individuals or a committee with the authority to review, approve, or reject concessions.
- Define the roles and responsibilities of personnel involved in the concession process.
Concession Request Process:
- Develop a standardized process for requesting concessions, including the required documentation and information.
- Ensure that concession requests include details such as the nature of the deviation, justification, potential impact, and proposed mitigation measures.
Review and Approval:
- Establish criteria for evaluating concession requests, including safety, regulatory compliance, and operational impact.
- Implement a review process involving relevant experts (e.g., engineering, quality assurance, safety) to assess the concession request.
- Ensure that all approved concessions are documented, including the conditions under which they are granted.
Implementation and Monitoring:
- Ensure that approved concessions are communicated to all affected personnel and properly implemented.
- Monitor the implementation of concessions to ensure compliance with the specified conditions and to identify any unforeseen issues.
Record Keeping:
- Maintain detailed records of all concession requests, including approvals, rejections, and associated documentation.
- Ensure that records are easily accessible for review and audit purposes.
Review and Continuous Improvement:
- Periodically review concession control processes to identify areas for improvement.
- Analyze concession data to identify trends and implement corrective actions to minimize the need for future concessions.
Concession Control Procedure
Initiating a Concession Request:
- Identification: Identify a situation requiring a deviation from standard procedures.
- Documentation: Complete a concession request form, providing all necessary details, including:
- Description of the deviation.
- Reason for the deviation.
- Impact assessment (safety, regulatory, operational).
- Proposed mitigation measures.
- Duration of the concession (temporary or permanent).
Review and Evaluation:
- Initial Review: Conduct an initial review to ensure the request is complete and justified.
- Technical Assessment: Involve relevant technical experts to evaluate the impact of the deviation and the effectiveness of the proposed mitigation measures.
- Risk Assessment: Perform a risk assessment to evaluate the potential impact on safety and compliance.
Approval Process:
- Approval Authority: Forward the concession request to the designated approval authority (e.g., engineering manager, quality manager, safety manager).
- Decision: The approval authority reviews the request, considering the technical assessment and risk evaluation, and makes a decision to approve or reject the concession.
- Documentation: Document the decision and any conditions attached to the approval.
Implementation and Communication:
- Implementation: Communicate the approved concession and any conditions to all affected personnel and ensure it is implemented as specified.
- Monitoring: Monitor the implementation to ensure compliance with the conditions and to identify any issues that arise.
Record Keeping and Reporting:
- Record Maintenance: Maintain a comprehensive record of all concession requests, decisions, and related documentation.
- Reporting: Periodically report concession activity to senior management and regulatory authorities as required.
Review and Continuous Improvement:
- Periodic Review: Conduct regular reviews of concession control processes and records to identify trends and areas for improvement.
- Feedback Loop: Use feedback from personnel and analysis of concession data to improve procedures and reduce the occurrence of deviations.
Best Practices for Concession Control
- Clear Criteria: Establish clear criteria for what constitutes a deviation and when a concession can be granted.
- Thorough Documentation: Ensure all concession requests and approvals are thoroughly documented, including justifications and risk assessments.
- Stakeholder Involvement: Involve relevant stakeholders (e.g., engineering, quality assurance, safety) in the review and approval process to ensure a comprehensive evaluation.
- Transparency: Maintain transparency in the concession process, ensuring that all decisions are well-documented and communicated to relevant parties.
- Continuous Improvement: Regularly review and refine concession control processes to enhance efficiency and effectiveness.
Conclusion
Effective concession control is essential for managing deviations from established procedures in an AMO. By implementing a structured process for requesting, reviewing, approving, and monitoring concessions, an AMO can ensure that deviations are managed in a controlled and transparent manner, maintaining safety, compliance, and quality standards.
Comments